132kV DC Transmission Line project for Super Dordi Hydrpower Project Kha 54 MW

Survey, Design, Engineering, Procurement, Manufacture, Test before Supply %26 Site Delivery, Insurance, Storage, Installation, Testing %26 Commissioning of 132 kV Double Circuit Transmission Lines, Stringing of a Single Circuit Line from Powerhouse Switchyard upto Interconnection Point, NEA Kirtipur Substation for Super Dordi Hydropower Project Kha 54 MW

10/14/2019